Moving offices? Keep your equipment records with the move

The Compliance Standard • October 22, 2026

Share this article

An office move can scatter equipment long before anyone notices a gap in the records. A monitor goes to another team, spare chargers disappear into boxes and a power board arrives at the new reception desk without anyone knowing where it came from. For Brisbane businesses, a simple equipment handover can make the move easier to manage.

You do not need a complicated new system. The aim is to keep each item connected to its identity, location and history while desks, cupboards and staff are changing places. The following steps are practical administration recommendations for a relocation; they do not set legal testing intervals or replace advice about your particular workplace.

Make a starting list before packing

Use your existing equipment register or latest testing report as the starting point. Add a column for the planned destination and another for the person coordinating the move. Keep the original information so the old location is still available when someone asks where an item was last used.

Walk through shared areas as well as individual desks. Meeting-room equipment, cleaners’ cupboards, kitchen appliances and stored extension leads are easy to overlook. Note equipment that will stay behind, go into storage or be retired. A move is a useful time to identify unknown items, without quietly treating them as checked or approved.

Pack equipment in identifiable groups

Label boxes by room or work area and keep a simple box list. For example, “Meeting room B — display accessories” is more useful than “miscellaneous cables”. Where an appliance has an existing asset identifier, preserve it and record the box number against that item.

Keep detachable leads and power supplies associated with their equipment where practical. Avoid mixing similar-looking adaptors and assuming they are interchangeable during unpacking. If you are unsure which supply belongs to a device, check the manufacturer’s information or ask the appropriate support person before reconnecting it.

Agree who handles reconnection

Coordinate the move with your IT and facilities contacts. Identify equipment that needs an agreed shutdown, specialist handling or a planned restart. Staff should know which items they can pack and which should be left for the nominated team.

At the new premises, check the proposed desk layout before arranging a testing appointment. Access behind desks, locked rooms and equipment still in transit can affect what is available on the day. Keep a short outstanding-items list so those gaps remain visible rather than disappearing when the main move is declared complete.

Check the condition after transport

Unpacking is an opportunity to notice damage that may have occurred during handling. If an item looks damaged or its condition is uncertain, keep it aside and ask the responsible person to arrange assessment before it is used. Do not take an old record as confirmation of its condition after the move.

Keep this separate from deciding the ongoing inspection and testing programme. The appropriate arrangements need to be confirmed for the equipment and its new environment. Tell your provider if an item that previously stayed at a desk will now travel regularly or be used in a different work area.

Reconcile the register room by room

Once equipment is in place, compare the register with what is actually there. Record the new location, identify missing assets and note replacements. Keep a distinction between an item that has been found, one that has been assessed and one that is still waiting for attention.

For equipment being retired, record that decision without deleting its history. If an item is transferred to another branch, agree who updates the receiving site’s list. A clear handover prevents two sites from assuming the other one is managing it.

Plan the next visit around the final layout

Give your provider an approximate item count, a list of unavailable equipment and a contact who can arrange access. Our guide to booking a workplace test and tag explains the information that helps organise a visit. For a staged relocation, the guide to managing multiple locations can also help with coordination.

If you are moving a Brisbane workplace, request a quote with your new location, likely move date and approximate equipment count. Clear information makes it easier to discuss a visit that fits the move.

Finally, give the updated register and reports a shared home. Nominate an owner and a backup contact, then close out the missing-item list after the final delivery. A successful equipment handover leaves the next person able to find both the appliance and its records.

Recent Posts

Warehouse staff walking between storage racks and stacked cartons
By Rob Thompson • November 23, 2026
Plan warehouse test and tag around shifts, dispatch windows and shared equipment. Practical preparation and handover tips from The Compliance Standard.
Point-of-sale screen and folded clothing on a retail shop counter
By Rob Thompson • November 19, 2026
Prepare shared retail equipment for a busy trading period. Organise storage, returned items, supervisor updates and access for a test and tag visit.
Coffee equipment and metal serving pots on a café counter
By Rob Thompson • October 28, 2026
Plan café and restaurant test and tag around preparation, service and closing. Organise equipment, access, staff contacts and a clear handover.
By The Compliance Standard • October 11, 2026
Prepare for workplace test and tag with an equipment estimate, access details, operating hours and previous records. Learn what to expect from the visit.
By The Compliance Standard • October 9, 2026
Learn how to remove failed equipment from use, record defects and arrange replacement or appropriately licensed repairs and retesting before reuse.
By The Compliance Standard • October 7, 2026
Explore a fictional test and tag report example, including asset identification, test outcomes, failed items, follow-up actions and relevant retest dates.
By The Compliance Standard • October 5, 2026
Understand small-business test and tag: equipment assessment, suitable schedules, access planning, failed-item handling and useful records after the visit.
By The Compliance Standard • October 3, 2026
Read how visual inspection and electrical testing assess workplace leads, what damage to look for and how to manage failed items and testing records.
By The Compliance Standard • October 2, 2026
Coordinate test and tag across multiple sites with equipment lists, local access contacts, suitable schedules, separate reports and clear defect follow-up.
By The Compliance Standard • October 1, 2026
Plan after-hours test and tag around access, shutdown-sensitive equipment and operating hours. Learn how to prepare your site and organise testing records.
Show More